000 | 00757nam a2200229 4500 | ||
---|---|---|---|
001 | 0000014696 | ||
008 | 231029s9999 xx 000 0 und d | ||
020 |
_a9780415629126 _cRM605.00 |
||
040 | _aPOLIMAS | ||
090 | 0 | 0 |
_a624.0681 _bPOT |
100 | 1 | 0 | _aPotts, Keith F. |
245 | 1 | 0 |
_aConstruction cost management / _blearning from case studies _cKeith Potts and Nii Ankrah |
250 | _a2nd ed | ||
260 |
_aLondon _bRoutledge _c2013 |
||
300 |
_axix, 367p _bill. _c25cm |
||
504 | _aIncludes references and index | ||
650 | 0 | 0 |
_aConstruction industry _xcost control |
650 | 0 | 0 |
_aConstruction industry _xcost control _xcase studies |
650 | 0 | 0 |
_aConstruction industry _xcosts |
650 | 0 | 0 |
_aConstruction industry _xcosts _xcase studies |
700 | 1 | 0 | _aAnkrah, Nii |
999 |
_c43971 _d43971 |